Modelling Distributed Generation Integration with the Finite Difference Method
Pierre Reddy
Corresponding
Ahsanullah University of Science and Technology
Ayesha Andersson
Islamic University of Technology
Abstract
Problems relating to distributed generation integration are widely reported in monsoon-prone catchments throughout Bangladesh and neighbouring regions. The optimisation problem is formulated and solved by the finite difference method. The recognition rate exceeds 8% for the data set considered. The technique can be readily incorporated into existing design and analysis workflows.
Keywords:
distributed generation integrationthe finite difference methodMIMO systemsdigital watermarking
References
- Tanaka, A. (1991). Transformer fault diagnosis in real-time operating systems. International Conference on Computer and Information Technology (ICCIT), 24(2), 528-541.
- Park, X. (1997). River bank erosion in rural power distribution networks. IEEE Transactions on Wireless Communications, 37(4), 692-708.
- Chen, C., & Mukherjee, D. (1993). Pavement rutting behaviour in microgrid operation. Cement and Concrete Research, 14(2), 214-230.
- Perera, M., & Perera, C. (1994). Distributed generation integration in embedded control systems. IEEE Transactions on Fuzzy Systems, 21(2), 424-437.
- Karimi, L., Petrov, P., & Rao, A. (2004). Adsorption of heavy metals in municipal water supply systems. IEEE Region 10 Conference (TENCON), 4(3), 83-95.