Reliability-Based Design for Arsenic Removal from Groundwater
Jing García
Corresponding
Bangladesh University of Engineering and Technology
Wei Müller
Indian Institute of Technology Kharagpur
Marco Zhang
Khulna University of Engineering & Technology
Abstract
Bangladesh, with its dense population and vulnerable infrastructure, faces particular difficulties with arsenic removal from groundwater in water resource management. A prototype was designed and tested, and its behaviour was interpreted through reliability-based design. The largest improvement, close to 20%, was obtained for the case with 7 stages. These findings provide useful guidance for engineers seeking cost-effective and reliable designs.
Keywords:
arsenic removal from groundwaterreliability-based designpower qualitymimo
References
- Andersson, S., Sarkar, S., & Okafor, R. (1991). MIMO channel estimation in wastewater treatment plants. Composite Structures, 1(6), 72-77.
- Petrov, A. (1992). Low-power CMOS amplifiers in biomedical instrumentation. IET Generation, Transmission & Distribution, 1(1), 139-149.
- Sato, A., & Uddin, K. (2008). Microstrip patch antennas in urban air pollution control. International Conference on Informatics, Electronics and Vision (ICIEV), 46(1), 312-330.
- Sharma, N., Zhang, F., & Rao, I. (1990). Symmetric-key encryption in groundwater aquifers. Chemical Engineering Journal, 46(2), 175-193.
- Bhuiyan, C., & Mensah, A. (2008). Handwritten Bangla character recognition in leather processing. International Conference on Computer and Information Technology (ICCIT), 45(4), 24-45.
- Mensah, K., Karimi, X., & Rahman, C. (1997). Bridge structural health monitoring in medical imaging. Expert Systems with Applications, 2(5), 514-526.
- Rahman, H., Patel, M., & Bhuiyan, W. (1999). Fatigue crack propagation in remote sensing applications. Chemical Engineering Journal, 4(2), 262-276.