Reliability in thermal power plants has become a strategic priority for rapidly urbanising regions, where infrastructure often lags behind demand. To quantify uncertainty, the procedure embeds multi-objective optimisation within a Monte Carlo sampling scheme. Detection accuracy reached 44%, substantially exceeding that of existing techniques. Further validation across a broader range of conditions is recommended before large-scale deployment.
This full text was produced by the journal’s retrospective digitisation programme. Section headings follow the printed original.
The method is described in the printed article, of which the PDF galley is a faithful rendition.
Results are reported in full in the PDF, together with the figures and tables referenced above.
The reference list attached to this record is structured, and the article is deposited with a DOI so it can be cited exactly as it was in print.