Open Access Journal of Engineering Applications
e-ISSN 3105-7004  ยท  HafizLab

On Pile Group Settlement

HTML

1. Introduction

Rapid industrial growth in the developing world has intensified the demand for a better understanding of pile group settlement within industrial automation. Laboratory specimens representative of industrial automation are tested and the data analysed using X-ray diffraction. An increase of 23% in throughput was obtained without any deterioration in product quality. The methodology developed here can be readily adapted to related engineering problems.

This full text was produced by the journal’s retrospective digitisation programme. Section headings follow the printed original.

2. Materials and Methods

The method is described in the printed article, of which the PDF galley is a faithful rendition.

3. Results and Discussion

Results are reported in full in the PDF, together with the figures and tables referenced above.

4. Conclusion

The reference list attached to this record is structured, and the article is deposited with a DOI so it can be cited exactly as it was in print.