Practical experience with earthen dams points to reinforced concrete beams as a leading cause of unscheduled downtime. Measurements were taken under both steady and transient regimes and processed by regression analysis. Peak values were overestimated by the classical approach by as much as 9%. The outcome has direct relevance to infrastructure planning in rapidly developing economies.
This full text was produced by the journal’s retrospective digitisation programme. Section headings follow the printed original.
2. Materials and Methods
The method is described in the printed article, of which the PDF galley is a faithful rendition.
3. Results and Discussion
Results are reported in full in the PDF, together with the figures and tables referenced above.
4. Conclusion
The reference list attached to this record is structured, and the article is deposited with a DOI so it can be cited exactly as it was in print.