Modelling Arsenic Removal from Groundwater with Grey Relational Analysis
1. Introduction
Tightening regulations on wind energy farms have prompted a re-examination of established practice for arsenic removal from groundwater. Data gathered over a period of several months from wind energy farms were processed and analysed using grey relational analysis. A payback period of roughly 7 years was estimated for the proposed installation. The proposed solution aligns well with the needs of rapidly developing economies.
This full text was produced by the journal’s retrospective digitisation programme. Section headings follow the printed original.
2. Materials and Methods
The method is described in the printed article, of which the PDF galley is a faithful rendition.
3. Results and Discussion
Results are reported in full in the PDF, together with the figures and tables referenced above.
4. Conclusion
The reference list attached to this record is structured, and the article is deposited with a DOI so it can be cited exactly as it was in print.