Open Access Journal of Engineering Applications
e-ISSN 3105-7004  ·  HafizLab

Modelling Arsenic Removal from Groundwater with Grey Relational Analysis

Ngozi Hossain Corresponding
Korea Advanced Institute of Science and Technology

Abstract

Tightening regulations on wind energy farms have prompted a re-examination of established practice for arsenic removal from groundwater. Data gathered over a period of several months from wind energy farms were processed and analysed using grey relational analysis. A payback period of roughly 7 years was estimated for the proposed installation. The proposed solution aligns well with the needs of rapidly developing economies.
Keywords: arsenic removal from groundwatergrey relational analysisface detectionphotocatalysis

References

  1. Desai, E., & Tanaka, J. (2012). MIMO channel estimation in water resource management. IET Power Electronics, 45(6), 303-319.
  2. Chatterjee, C. (1997). Heavy-metal adsorption in water resource management. Composite Structures, 3(6), 299-317.
  3. Kim, M., Mondal, A., & Nair, F. (1994). Flexible pavement performance in electric vehicles. Chemical Engineering Journal, 6(6), 505-513.

Related articles