Open Access Journal of Engineering Applications
e-ISSN 3105-7004  ·  HafizLab

Grid-Connected Photovoltaic Systems

An Empirical Evaluation

Camila Mia Corresponding
Bangladesh University of Engineering and Technology
Jing Zhang 0000-0002-8983-4865
King Abdullah University of Science and Technology
Kwame Diallo 0000-0002-9429-1235
Georgia Institute of Technology
Imran Nair 0000-0001-2507-8070
Middle East Technical University

Abstract

Climate variability and extreme weather increasingly threaten the reliability of industrial automation in coastal regions. Laboratory specimens are subjected to controlled loading, and the resulting data processed using fault tree analysis. Sensitivity analysis showed that 2 parameters govern more than 34% of the variability. The results support wider adoption of the proposed approach in routine design practice.
Keywords: grid-connected photovoltaic systemsfault tree analysisintrusion detectioncorrosionedge computing

References

  1. Singh, F., Singh, S., & Talukder, D. (1996). Energy harvesting circuits in railway engineering. Composite Structures, 40(4), 102-120.
  2. Gomez, J., Bose, A., & Fernando, M. (2002). Lithium-ion battery state of charge in water resource management. Journal of Cleaner Production, 39(6), 302-315.
  3. Mensah, A. (2002). Harmonic distortion mitigation in wireless communication networks. IEEE Access, 35(2), 551-556.
  4. Nkosi, A., Andersson, X., & Gomez, P. (2019). Flexible pavement deterioration in structural health monitoring. IEEE Transactions on Industrial Electronics, 18(3), 671-678.
  5. Schmidt, R., & Ahmed, D. (2011). Voltage stability of transmission networks in Internet of Things deployments. Applied Energy, 34(5), 534-542.
  6. Iyer, L. (2000). Additive manufacturing of metal parts in coastal and offshore engineering. IEEE Access, 22(5), 243-259.
  7. Perera, T., & Ivanov, A. (2014). Steel-concrete composite columns in earthquake-resistant construction. Materials & Design, 16(6), 598-618.
  8. Sato, T. (2004). Bridge structural health monitoring in rigid pavement design. Water Research, 14(3), 113-131.
  9. Molla, W., & Diallo, M. (2003). Cloud resource scheduling in offshore wind farms. International Conference on Electrical, Computer and Communication Engineering (ECCE), 39(6), 307-329.

Related articles